Sept 2009 a complete concrete floor poured.
![](images/WWD_02.jpg)
Completely new floor, shown from stage.
![](images/WWD_03.jpg)
New access doors in south wall connecting to wheelchair ramp.
![](images/WWD_04.jpg)
New wheelchair ramp leading to new south access doors.
![](images/WWD_05.jpg)
New front for orchestra pit using original theatre railing.
![](images/WWD_06.jpg)
We were able to stabilize and save the brick exterior for our new annex.